Phone (+45) 31 640 550 UK: (+44) 203 8077 677 mail@prestonrentals.dk

Building materials – the quickest way to the right floor

Rent SuperDeck® by clicking here
Read more..Contact us..
Fast delivery

Our rental range

SuperDeck®

SuperDeck®Patented ‘drawer-like’ loading platform system, designed specifically to handle a swift loading of building materials and machines 

⦁ 5,000 kg load
⦁ No electricity or hydraulics needed
⦁ 2.2 / 2.6 / 3.2 & 4.2 metres width

SuperShore® Multiprop Lightweight pillars

Multiprop is a well-known and thoroughly tested lightweight product for temporary support of constructions.

⦁ Length: 1450mm to 6250mm 
⦁ Light weight: 15,6 – 34,8 kg
⦁ Approved according to Class T, R & D

More than 30 years with SuperDeck

We let out our patented SuperDeck® ‘drawer-like’ loading platform system

In Europe you build higher, bigger and more dense than ever before. This creates new challenges concerning logistics of a construction site.

This is particularly evident in regard to the construction of multi-storey buildings where it is heavy and problematic to move building material and machinery to the right floor. SuperDeck® has for more than 30 years solved this particular problem in Australia and now this solution has finally arrived to Europe.

At Preston Rentals we let out the full range of SuperDeck® ‘drawer-like’ loading platform systems and supplement the SuperDeck solution with small cranes and light weight soldiers.

9

Quickest on the right spot

Lift up to 5,000 kg of machinery and building materials directly from the truck to the Superdeck® ‘drawer-like’ loading system in just one go.

It reduces crane operation time, keeps order on the construction site and reduces the workers’ waiting time for the material.

9

Minimize waste and injuries

Fewer materials on the ground and fewer lifts reduce the risk of transport damages, waste and theft from the construction site.

9

Keep-it-simple

SuperDeck® ‘drawer-like’ loading platform system demands no electricity or hydraulics. The ‘drawers’ work on rolls/cylinders (?) and are delivered ready for installation at the construction site.

9

High Safety

Workers have fewer manual lifts and the loading platform will be ready as soon as you start using them.
SuperDeck® is easy to operate and you can start using it when it is installed – without making any adjustments. This makes it possible to focus on the reception of your subject, building materials and machinery. As soon as the cargo is placed on the ‘drawer’, it is transported to the floor with e.g. a pallet-lifter (?). The height of the safety rail of the platform is 1,2 metres.

Welcome as a customer at Preston Rentals

I have 22 years of experience in the entrepreneur and material and machinery business. The many years in the same business have given me an in-depth experience in many types of projects – large as well as small scale. I have always found it extremely difficult, time-consuming and at times dangerous when building materials and machinery have been transported to the different floors during the construction of multi-storey building.

I happened to notice the SuperDeck® ’drawer-like’ loading platform system during a business travel and from then on I simply knew I had to get that system to Europe.

Martin Bo Bojesen
CEO
Tlf. +45 31 640 550

SooSolutions Inspiration

Boltdown

Facaden

2-4 Props

Spreader Beams

Interim

SuperDeck Equipment

Bathroom Installation

Danske Bank construction in Aarhus, Denmark
Video

How to install SuperDeck

(4:44)

1 + 9 =

Adress UK

Preston Rentals ApS
48 Charlotte Street London
Greater London WIT2NS – United Kingdom

Phone

UK: +44 203 8077 677
DK: +45 31 640 550

Adress DK

Preston Rentals ApS
Gunnar  Clausens Vej 19 B
DK-8260 Viby J

Email

mail@prestonrentals.dk